Notes ·

Release-Day Measurement Checks

A short checklist that keeps Friday deploys from quietly breaking Monday’s funnel.

Whiteboard with sticky notes planning a workflow

Feature flags and redesigns often move screens without updating the events that described the old flow. The dashboard still renders; the story is wrong.

On release day, walk the critical path once with a debug build and confirm expected events fire with the right properties. Compare volume for key events against the prior seven-day baseline within twenty-four hours.

Assign an owner for the check—not “the analytics person if they have time.” Ownership maps in our handoff pack make this assignable.

When something drifts, open a ticket the same day. Silent breakage compounds faster than missing features.

Talk through a measurement question